EDF Rod Drop Monitoring
ITI GroupRod Drop Monitoring Commercial Off-The-Shelf (COTS) System Integration, initially installed at Hinkley Point B, Dungeness and Hunterston B.
- TA5 1UD, United Kingdom
Rod Drop Regulatory Requirements
The recording of control rod drop times is a regulatory requirement of the nuclear site license.
ITI Group’s Rod Drop Monitoring system uses commercially off-the-shelf hardware and software, can be easily adapted to the requirements of any nuclear power station, overcomes the spares issues with obsolete equipment, and has a proven install base.
System benefits
Automatic data processing
The previous system involved laborious manual intervention to process & print the data charts. All data processing & chart printing is fully automated in the new system.
Calibration facility
The system includes a calibration spreadsheet HMI to allow operators to calibrate the rod height data against actual rod height (conversion of pulse inputs into analogue rod height).
Resolution
The system provides increased resolution & extended windows for the data charts. This enhances the data quality for ‘post trip’ analysis work.
Chart Display
Multi-line detailed charts showing 2secs before trip and 28secs afterwards.
Security
User access is based on an ‘administrator controlled’ user privileges set-up.
File management and archiving facility
Offering user-friendly off-line storage of trip & calibration data.
Real-time rod height display & slack switch status
Automatic collection of ‘reactor trip’ data.
Data window requirements:
- Data window to start at 2 sec. pre trip condition.
- Data window to extend for 28 sec. post trip condition
- Data collection to include all 121 rods.
- Data resolution: 20 msec.
Data visualised through chart display & printouts
Rod height versus time.
System calculates intermediate values
Alarm system
Including reactor trip, power supply failure & system health status