Pipebridge
West Cumberland Engineering LtdWest Cumberland Engineering manufactured 13 modular Pipebridge units totalling 150 tonnes of steel with 300+ butt welds at 100% first-time pass rate for Shepley Engineers.
- CA20 1PG, United Kingdom
The scope of work for this project was to manufacture, inspect, package and deliver thirteen individual Pipebridge modules, with incorporated pre-installation of cable containment and insulated pipework, along with complete Life Time Quality Records. Due to the requirements of the Quality Plan, this project required close cooperation between WCEL and the client, which resulted in a successful project from manufacture to installation and handover. The Pipebridge installation was managed and carried out by Shepley Engineers Ltd. The installation phase was also completed to time and budget, with zero issues and a smooth handover
West Cumberland Engineering carried out over 300 pipe butt welds, with a 100% right-first-time pass rate. The project successfully saw 13 pressure tested modules installed, with the largest module being over 60 tonnes. The combined weight of all structural steel was 150 tonnes.
Key Facts
- Total Value
- £2,500,000